Dry Utilities Project
Client: AT&T
Project: El Camino Real Substructure Upgrades
Location: Atascadero, California
Project Value: $103,354
MGE was called upon to install 30,000 duct feet of 4-inch diameter conduit in various configurations, as well as multiple manholes, sub-boxes and pedestals. Construction also included the directional bored installation of two 14-inch diameter casings and the construction of a new concrete interface pad with ground rods to accommodate the service upgrade. MGE self performed all aspects of construction for this project which was completed on time and under budget.